Skip to main content

Projects

Large cylindrical storage tanks on a hilltop with a vibrant sunset and cityscape in the background.
Holly Drive Tank Site (2024)

 

Projects Currently Out to Bid:

 No projects currently out to bid (12/04/2024)

Projects in the works

  • New Office and Operations Yard Facilities (under design)
  • Forebay Outfall Modernization (under design)
  • Well 31 Pipeline Replacement (contract awarded)

Projects Completed in 2024

  • Construction of Holly Drive Reservoir, Phase III
  • Well 19 Pilot Hole and Full Well Design

Projects Completed in 2023

  • Glendale Road Pipeline Replacement
  • Well 16 Modernization
  • Wells 31 Modernization

Projects Completed in 2022 Include:

  •  2020 Master Plan and Computerized System Model
  • Technical Study of Possible Treatment Plant
  • Predesign Report of Paloma Curve Hydraulic Break Modernization
  • Design of Glendale Road Pipeline Replacement
  • Design and Bidding of Holly Drive Reservoir, Phase III
  • State Mandated Supply Assessment Report
  • State Mandated Water Audit Validation Report
  • State Mandated Emergency Response Plan (ERP)

Projects Completed in 2021 Include:

  • Holly Drive Tank, Phase II
  • Cliff near Euclid Crescent and Cliff pipeline
  • Primrose, north of 25th pipeline
  • Linda, north of 24th pipeline
  • Domestic and Irrigation Meter Replacements
  • Frankish Tunnel Pipeline Repair and Meter Install
  • Reservoir 9 pipeline replacement
  • Installation of emergency generators at Booster 17, Booster 19 and Shaft 6
  • Demolition of two abandoned booster stations
  • System Mapping and GIS Database
  • Urban Water Management Plan
  • American Water Infrastructure Act Vulnerability Assessment and Emergency Response Plan